Peace condensate is gathered from gas plant operations in the foothills to the northwest of Edmonton, and batch delivered to Edmonton on the Pembina Peace pipeline. CPR is blended into CRW at the Enbridge Edmonton Terminal on an intermittent basis dependent on batch arrivals.
Batch: CPR-255 --- Date: October 07, 2024 --- Sample Location: Edmonton
Propane and butanes were reduced, while mercaptans were elevated for the October sample of Peace Condensate.
View data for the last six samples.
Use the checkboxes for each table below to select data and choose a date range to export a .CSV file containing the selected data groups. Use Excel, or other software, to view and manipulate the data for your purposes.
View a pdf document with summary data for the selected sample date.
Screen too narrow to display chart. Try landscape view on mobile.