MSW Feeder

Density (kg/m3): 811 - 837
Gravity (oAPI): 37 - 43

▸ Federated (FD)

▸ Light Smiley (MSY)

▸ Peace (MPR)

▸ Pembina (P)

Light Sweet

Density (kg/m3): 818 - 826
Gravity (oAPI): 39 - 42

▸ Mixed Sweet Blend (MSW)

▸ Rainbow (RA)

Medium Sour

Density (kg/m3): 837 - 871
Gravity (oAPI): 30 - 38

▸ Hardisty Light (MBL)

▸ Medium Gibson Sour (MGS)

▸ Midale (MSM)

▸ Peace Pipe Sour (SPR)

Heavy Sour - Synbit

Density (kg/m3): 930 - 936
Gravity (oAPI): 19 - 21

▸ Long Lake Heavy (PSH)

▸ Statoil Cheecham Synbit (SCS)

▸ Surmont Heavy Blend (SHB)

Heavy Sour - Partially Upgraded

Density (kg/m3): 936 - 937
Gravity (oAPI): 19 - 20

▸ Albian Heavy Synthetic (AHS)

Heavy Low Resid

Density (kg/m3): 937 - 938
Gravity (oAPI): 19 - 20

▸ Suncor Synthetic H (OSH)






Reports for Boundary Lake

Batch: BDY-008 - Kamloops

Date: Aug 31, 2016
The August sample of Boundary Lake was consistent with historical trends.
View sample data.


Batch: BDY-004 - Kamloops

Date: Apr 28, 2016
The April sample of Boundary Lake had reduced density and sulphur along with increased C5 x C7 contents.
View sample data.


Batch: BDY-002 - Kamloops

Date: Feb 29, 2016
Apart from marginally reduced sulphur, the February sample of Boundary Lake was consistent with historical averages. Typical simulated distillation results are included.
View sample data.


Batch: BDY-012 - Kamloops

Date: Dec 31, 2015
Marginally reduced density and sulphur were observed in the December sample of Boundary Lake. Typical simulated distillation results are included.
View sample data.


Batch: BDY-010 - Kamloops

Date: Oct 31, 2015
Boundary Lake saw slightly decreased sulphur and BTEX in the October sample. Typical simulated distillation results are included.
View sample data.


Batch: BDY-008 - Edmonton

Date: Aug 31, 2015
Boundary Lake was consistent with historical data for the August sample.
View sample data.


Batch: BDY-006 - Kamloops

Date: Jun 30, 2015
Density and sulphur were reduced while C4 x C7 contents were increased in the June sample of Boundary Lake. Typical simulated distillation results are included.
View sample data.


Batch: BDY-012 - Kamloops

Date: Dec 31, 2014
Boundary Lake contained typical light ends and bulk properties for the December sample.
View sample data.


Batch: BDY-010 - Kamloops

Date: Oct 31, 2014
Boundary Lake was consistent with historical averages for the October sample.
View sample data.


Batch: BDY-008 - Kamloops

Date: Aug 31, 2014
Apart from a slight reduction in MCR, the August sample of Boundary Lake was consistent with historical data.
View sample data.


Batch: BDY-004 - Kamloops

Date: Apr 30, 2014
Apart from marginally reduced MCR, the May sample of Boundary Lake contained typical light ends and bulk properties.
View sample data.


Batch: BDY-012 - Kamloops

Date: Dec 20, 2013
Sulphur, metals and hexanes were slightly increased for the December sample of Boundary Lake. Typical simulated distillation results are included.
View sample data.


Batch: BDY-010 - Kamloops

Date: Oct 31, 2013
Slightly elevated density and sulphur were detected in the October sample of Boundary Lake.
View sample data.


Batch: BDY-831 - Kamloops

Date: Aug 31, 2013
The density and C7 x C10 contents were slightly higher than average. In addition, the pentanes and hexanes were slightly lower than average in the August sample of Boundary Lake.
View sample data.


Batch: BDY-630 - Kamloops

Date: Jun 30, 2013
Boundary Lake contained slightly elevated sulphur as well as marginally reduced MCR. Typical simulated distillation results are included.
View sample data.


Batch: BDY-304 - Kamloops

Date: Apr 30, 2013
Marginally elevated density, sulphur, and metals were observed in the April sample of Boundary Lake.
View sample data.


Batch: BDY-002 - Kamloops

Date: Feb 28, 2013
Notable increases in sulphur and metals were detected in the February sample of Boundary Lake. Density was marginally increased compared to historical data.
View sample data.


Batch: BDY-915 - Kamloops

Date: Sep 15, 2011
Decreased C4s x C6s and above average BTEX and C7s x C10s were noted for the September sample of Boundary Lake. This is the first sample of Boundary Lake received since the end of 2010.
View sample data.


Batch: BDY-012 - Kamloops

Date: Dec 31, 2010
Slight decreases in C4s x C5s and marginal increases in C8s x C10s, ethyl-benzene, xylenes, metals and sulphur were observed for this month's sample of Boundary Lake. Simulated distillation results were available for this sample.
View sample data.


Batch: BDY-010 - Kamloops

Date: Oct 31, 2010
Slight increases in metals and sulphur were observed for the October sample of Boundary Lake.
View sample data.


Batch: BDY-009 - Kamloops

Date: Sep 30, 2010
The September sample of Boundary Lake had slightly decreased C4s x C6s and benzene and marginally above average sulphur, nickel, and density.
View sample data.


Batch: BDY-012 - Kamloops

Date: Dec 31, 2009
In spite of typical light ends, the December sample of BDY had a lower than average density (830.0 kg/m³ versus 842.2 kg/m³ average) along with slightly increased sulphur. Fairly typical simulated distillation results were received for this sample.
View sample data.